• PROJECT CHALLENGES:

    Design and construction to meet requirements of Heathrow Airport and Thames Water; drilling beneath busy, operational main road

160m-long box culvert designed to act as foul water storage tank with restricted discharge to the public sewer

This foul water storage culvert included hydraulic modelling. It is fed by a 550m rising main at Crowne Plaza Hotel and a 250m rising main from Premier Inn Hotel, both on the Heathrow site. Working to precise airport standards the rising main was directionally drilled beneath the A30 carriageway.

It was constructed in reinforced concrete, with an internal diameter of 1.5 x 3.0m.

TAYLOR+BOYD’s engineers worked in close liaison with Thames Water to procure an Impact Study, plus adoption and connection approvals.

We supervised the on-site construction and inspected quality of construction against design.

Contact

Belfast Office

107 Malone Avenue
Belfast BT9 6EQ

028 9066 7951

Derry Office

10 Ebrington Square
Londonderry BT47 6FA

028 7126 7115

Letterkenny Office

Colab Building, Port Road
Letterkenny, Co Donegal

+353 87 620 3111

Email

postbox@taylor-boyd.com

Contact