• PROJECT CHALLENGES:

    Working to a PPI contract; phasing of demolition, construction, decant within timescale and budget

  • AWARDS:

    CEF Specify Construction Excellence Awards, 2009

Development of campus with grammar school, 6th form college and primary school

The project required careful phasing of works. Procured using the PFI/PPP method, the new building was constructed adjacent to existing buildings and on the site of the demolished Glenlola School. It features a curved front elevation block, which links into three ‘fingers’ housing teaching accommodation, assembly hall, dining hall and sports hall.

The new school buildings are three-storey, structural steel-framed on piled foundations with retaining structures to introduce the building into the existing sloping site.

On completion of the state-of-the-art facilities, the school relocated into these new premises and the existing Bangor High School was demolished and the ground re-used for all weather pitches, tennis courts, and car parking. These were all designed to achieve a cut to fill balance to minimize the removal of spoil from the site. New access arrangements from nearby main roads have also been designed.

(Images from McAdam Design)

Contact

Belfast Office

107 Malone Avenue
Belfast BT9 6EQ

028 9066 7951

Derry Office

10 Ebrington Square
Londonderry BT47 6FA

028 7126 7115

Letterkenny Office

Colab Building, Port Road
Letterkenny, Co Donegal

+353 87 620 3111

Email

postbox@taylor-boyd.com

Contact