KEY PERSONNEL:
PROJECT CHALLENGES:
Checking the existing structure for additional loads associated with various types of cladding; evaluation different load paths for temporary phases and permanent installation; continuity of business within the building
Recladding a large administrative office block
TAYLOR+BOYD was the original project structural engineers over 20 years ago. The work involved checking the existing structure for additional loads and different load paths to suit the different cladding system being proposed. Phasing and temporary stability of the existing structure was also critical throughout the design and construction process. This was all undertaken while keeping the building fully operational throughout.