• PROJECT CHALLENGES:

    Health & safety in relation to the busy adjacent A-road; neutralising services prior to demolition of existing building

New orthodontic surgery

Six surgery rooms, support ancillaries, conference room, office, laboratory, staff room.

The brown-field site was a former telecommunications sub-station. Pylons and aerials were dismantled when acquired by our client but the existing buildings remained. Numerous service lines had to be decommissioned and the main building demolished; however service surveys revealed a live electricity supply. This was safely dealt with prior to demolition.

The basement is constructed in reinforced concrete in-situ wall and floor slab with tanking and external insulation. Ground floor construction typically consists of pre-cast hollow-core units on compacted hardcore with no void, with floating screed on insolation on top of pre-cast units.

Service surveys were commissioned and comprehensive risk assessments drafted for inclusion in the Pre-construction Information Pack issued with the tender documents.

To minimize the visual impact of the building in the landscape, the car park is partially hidden by generously planted raised earth mounds. Rainwater and surface water are fed into a soak-away which is located in the earth banks.

Contact

Belfast Office

107 Malone Avenue
Belfast BT9 6EQ

028 9066 7951

Derry Office

10 Ebrington Square
Londonderry BT47 6FA

028 7126 7115

Letterkenny Office

Colab Building, Port Road
Letterkenny, Co Donegal

+353 87 620 3111

Email

postbox@taylor-boyd.com

Contact