Galliagh Phase 1&2 , Derry/Londonderry
This social housing development consists of 197 new dwellings including apartments, 2 & 3 floor dwellings and complex needs units.
Units are either founded on traditional strip foundations on trench fill concrete or pre-cast driven piles with reinforced concrete pile caps and ground-beams. Ground floors are constructed using suspended concrete floor units.
The Civil Engineering design included a new access road from a busy main road and the new road layout within the site to meet statutory requirements including Geotechnical Approval and Technical Approval of Highway Structures. A full drainage design was produced to the approval of NI Water. The road and drainage networks had to be designed and constructed to support future phases of development.
The site won the ‘Best Large Housing Development’ at the CIH Housing Awards 2018.