June 30th, 2017
The initial requirement was for 144 homes of various sizes. Significant savings were made and 11 additional homes were constructed within budget. The scheme included general needs housing and a few bespoke dwellings for vulnerable people. Drainage infrastructure in the area had insufficient capacity for this large development. T&B worked closely with NI Water…
September 1st, 2017
The project included a new 3-storey steel-framed extension, with fenestration and stonework to match the existing B+ Listed school buildings. A number of additional single and 2-storey steel-framed buildings were constructed around the existing main 4-storey building to cater for Craft, Design & Technology, Music, a dining area, gymnasium, fitness suite and purpose-built sports…
December 4th, 2015
Donegal Community Hospital – Mental Health & Family Services Centre, Republic of Ireland. The structure of this building combines both traditional load bearing masonry and structural steelwork framing. The open plan reception area has been framed out, and includes a first floor overhang that shelters the main entrance area. The ‘butterfly’ roof adds a unique…
November 10th, 2017
We developed this multi-storey hotel in Edinburgh to meet all the associated regulations and challenges of its airport site.
April 15th, 2016
Londonderry Park is situated on the outskirts of Newtownards and is bounded by the Portaferry Road to the west and the Old Shore Road to the east. The site is in close proximity to the northern shore of Strangford Lough. The old Newtownards canal runs parallel to the Old Shore Road. The Site Investigation…
June 30th, 2017
This is an 8-storey hotel with 615 bedrooms, short-stay crew rooms, conference rooms, restaurant, bar, reception, seated lounge, coffee bar, buffet, kitchens, toilets and flight check-in pods. Our engineers faced several challenges: By locating the car park at semi-basement level, the hotel’s overall height was kept within Air Traffic Control restrictions while enabling the…
July 11th, 2018
The planned development of Annesgate offices as a boutique hotel expanded to include properties in Church Lane, ultimately creating a hotel, restaurants, bars and night club over four floors, rooftops and courtyard. Phase 1: Taylor & Boyd assessed the 1956 office structure, vacant for some time but in sound condition. We commenced design to…
April 12th, 2019
A new campus developed on a confined site for the amalgamation of two adjacent schools, both of which remained operational without incident throughout construction. Building is three storey, structural steel framed on piled foundations with retaining structures to introduce the building into the existing sloping site. Procured using the PFI / PPP.
December 17th, 2015
This scheme involved designing supporting structure to facilitate the replacement of the heating infrastructure at Craigavon Area Hospital. Carefully planned phasing was essential to ensure that the hospital’s requirements continued to be met without interruption. Due to the deteriorated condition of existing tunnels; the limiting of space by roads and paths around buildings; and…