Pond Park Primary School, Lisburn
The project involved the provision of a Civil and Structural Engineering design solution to RIBA Stage D; the selection of contractors; the subsequent tendering of the project to a select list of Design and Build contractors; and the subsequent overseeing of the Design and Construction process as Client Representative.
The project involved the design of a replacement 21-classroom primary school on a very restricted site. The structure comprised single- and two-storey blocks of load-bearing masonry construction, with a steel framed hall and dining area. Play areas and a synthetic pitch along with the re-organisation of the roadway accessing the school also formed part of the contract. (Images courtesy of Graham.)
View More ProjectsClick to expand the photos below